Demo environment — data may be reset without notice. Not for production use.
VanillaPM
Sign in Get started free Dashboard
Free template

Quality management plan template

A free quality management plan template in Word and Markdown — standards, quality objectives and metrics, roles, quality assurance, quality control, cost of quality and continuous improvement.

Download Word (.docx) Download Markdown (.md) Free · no sign-up · opens in Word, Excel, Google Docs/Sheets and LibreOffice

What's inside

  1. Purpose and scopeWhat this plan covers and who keeps it up to date.
  2. Quality standards and requirementsThe standards, codes, specifications and customer requirements the work must meet.
  3. Quality objectives and metricsWhat you will measure, the target, how it is measured and how often (table below).
  4. Roles and responsibilitiesWho plans quality, who inspects, who can accept or reject work.
  5. Quality assuranceHow you will check that the process is followed: audits, reviews, mock-ups, hold points.
  6. Quality controlHow you will inspect and test the deliverables, and what happens to work that fails.
  7. Cost of qualityThe budget for prevention and appraisal, and how failure costs will be tracked.
  8. Continuous improvementHow lessons and defect trends feed back into the way the work is done.

Includes a ready-made table with 6 columns: Metric · Target · Tolerance · How it is measured · Frequency · Owner.

What a quality plan is

The quality management plan says which standards the work must meet, how you will make sure the way you work produces it (quality assurance), and how you will check the results (quality control). It turns "high quality" into numbers someone can measure.

When to use it

During planning, alongside the scope and the schedule, because inspections, tests and hold points take time and money. Review it when the requirements change or defect trends show a problem.

How to fill it in

  1. List the standards: codes, specifications, client brand standards, certifications.
  2. Set measurable objectives in the metrics table: a target, a tolerance, how and how often it is measured, and who owns it.
  3. Name the roles: who inspects, who can accept work, and who can stop it.
  4. Plan assurance: audits, design reviews, mock-ups and hold points before work is covered up.
  5. Plan control: the inspections and tests, and what happens to work that fails.
  6. Budget the cost of quality: prevention and appraisal are planned costs. The cost of quality calculator shows the split, and the Cp / Cpk calculator checks whether a process can meet a tolerance.

Common mistakes

  • Objectives without numbers. "Good finishes" can't be passed or failed.
  • Inspection only at the end, when fixing a defect costs the most.
  • No budget for prevention and appraisal, so they're the first things cut.

See it used on a real project: Pr7 · Plan and optimise quality